For New construction

Vastu Report Before Foundation Pour

Building a new house is a ₹50 lakh to ₹3 crore commitment. The cheapest time to adjust for Vastu is BEFORE foundation pour — moving a wall on paper costs nothing, moving a wall after construction can cost ₹2-5 lakh per change. The Vastu Intelligence Report runs the full classical computation on your draft layout, points out the violations, and lets your architect tweak the drawing before the JCB shows up.

Common scenario

You're 4 weeks from foundation pour. Architect has frozen the layout. Family wants to know if the Vastu reads right before committing.

Why a Vastu report matters here

  • A wall moved on paper: ₹0 · After foundation: ₹2-5 lakh · After moving in: ₹15+ lakh and 6 months of dust
  • Family disagreements about Vastu are easier to resolve with a numerical score than with opinion
  • Architect doesn't have to do another 3 revisions to satisfy 'something feels off' — give them a specific list
  • The 30-page report is a permanent record — useful for resale, useful for the next generation

What the report tells you

  • Aayadi numerology — do your plot dimensions in hasta pass the Aaya > Vyaya gate?
  • Per-room placement score — which rooms are in their classical zones, which are compromised, why
  • Brahmasthan integrity — is the central one-ninth clear of toilets, heavy mass, structural columns?
  • Entry pada — is your main door on an auspicious pada or one of the 12 inauspicious slots?
  • Owner-building Tara Bala — is your birth Nakshatra compatible with the building's Aayadi Nakshatra?
  • Specific remedies — if a room is compromised, what's the minimum-cost fix (mirror, plant, partition shift)?

Recommended SKU for new construction

Vastu Intelligence Report
2,499

The full 30-page report is the right tier for new construction because it computes per-room 7-factor energy scores that need our internal layout coordinate data. Requires you to have first generated the layout via our Layout-complete (₹3,999) bundle. The combined ₹6,498 outlay is recoverable on the first design change you avoid making after foundation pour.

Order this report →

Frequently asked

Can I use my architect's CAD drawing instead of your AI floor plan?

Audit Standard (₹999) and Premium (₹1,999) accept any uploaded floor plan including architect CAD exports. The full 30-page Intelligence Report (₹2,499) needs our layout because it computes per-room energy scores from internal coordinate data the upload flow can't extract reliably. If your architect's drawing is the constraint, order the Premium Audit instead — same Vastu computation, slightly shorter report.

How long before pour should I order this?

Minimum 2 weeks before pour, ideally 4-6 weeks. The report itself is generated in minutes, but you'll want time to take findings back to your architect and have them revise the drawing. Architect revisions take 3-7 days, then your final freeze, then the actual pour scheduling. 6 weeks gives comfortable margin.

What if my architect says Vastu is 'superstition'?

Many architects do say this. The report's purpose is not to override an architect — it's to give the FAMILY a numerical reading they can use in their own decision. Most families in India do care about Vastu even when their architect doesn't, and arguing without data leads to bad outcomes. The report converts the argument into a decision matrix.

Do you offer the report in Hindi?

The PDF is delivered in English with Sanskrit verse citations preserved in Devanagari. Hindi translation of the body text is on the Phase-2 roadmap — DM @grehyug on Instagram if it's a blocker for your purchase.

Order yours

Vastu Report Before Construction — Adjust Layout Before Pour | GrehYug